Skip to content

Change platforms without losing data, orders or sleep

AS-ISAPI LAYERREV BIDENTITYORDERSBILLINGREPORTINGLEGACY MONOLITHTO-BE SERVICES6 STAGES123456

We move applications, online stores and databases from ageing platforms to modern ones, with field-level data checks, rehearsed cutovers and a rollback path ready.

Parts list

  1. Migration readiness assessment
  2. .NET and PHP stack upgrades
  3. Monolith to cloud-native moves
  4. Ecommerce replatforming
  5. Database migration
  6. Data validation and reconciliation
Project
Platform Migration
Discipline
Modernization & Transformation
Drawn by
Nexzem engineering
Scale
Not to scale

Replatforming handled as an engineering project, not a leap of faith

Platform migration means moving a working application and its data from one platform to another: an ASP.NET Web Forms app to modern .NET, a PHP 5 codebase to Laravel or Node.js, a Magento 1 store to Shopify or Adobe Commerce, an Oracle or MS Access database to PostgreSQL. The business logic largely stays the same. What changes is the runtime, framework, database or commerce engine underneath it.

Teams usually start a migration when a platform reaches end of life, licence costs keep rising, hosting providers drop support, or hiring developers for the old stack gets hard. This is narrower than our legacy modernization work, which redesigns architecture, and different from cloud migration, which moves servers and infrastructure. Here the focus is code, data and a clean switchover.

Nexzem begins with an inventory of every module, integration, URL and data table, then builds automated migration scripts and runs them repeatedly against copies of production. Row counts, checksums and sample records are compared after every run. Cutover happens in a planned window, with the old platform kept warm so we can roll back within minutes if a check fails.

Platform Migration, re-drawn piece by piece

  1. Inventory and audit (current)
  2. Target design
  3. Build migration tooling
  4. Rehearse and validate
  5. Cutover
  6. Hypercare

Inventory and audit. We catalogue modules, data, integrations, URLs and dependencies on the current platform.

Our Platform Migration services

Move applications, stores and databases to a new platform with validated data, a tested cutover and a rollback plan.

  1. 01

    Migration readiness assessment

    An inventory of code, plugins, integrations, data volumes and SEO assets, with a risk register, target platform recommendation and phased cutover plan you can budget against.

  2. 02

    .NET and PHP stack upgrades

    Porting .NET Framework, Web Forms and WCF apps to current .NET, or old PHP and CodeIgniter code to Laravel or Node.js, keeping behaviour identical for users.

  3. 03

    Monolith to cloud-native moves

    Repackaging a single large application into containers and managed services in stages, so each piece can run, scale and deploy on the new platform independently.

  4. 04

    Ecommerce replatforming

    Magento 1, OpenCart or WooCommerce stores moved to Shopify or Adobe Commerce with products, customers, order history, reviews and URL redirects carried across.

  5. 05

    Database migration

    Moving Oracle, SQL Server, MySQL or Access data to PostgreSQL, including schema conversion, stored procedure rewrites, encoding fixes and performance tuning on the new engine.

  6. 06

    Data validation and reconciliation

    Automated comparisons of row counts, checksums, balances and sampled records between source and target after every rehearsal, with a signed report before go-live.

  7. 07

    Zero-downtime cutover

    Change data capture, dual writes or read-only freeze windows planned around your traffic, so customers keep ordering and staff keep working during the switch.

  8. 08

    Rollback and hypercare

    A documented rollback path, the old platform kept on standby, and two weeks of close monitoring and fixes after the new platform goes live.

Platform Migration with Nexzem: what you get

  • R-01

    No lost records

    Every table and entity is reconciled between old and new systems, and you approve the numbers before cutover.

  • R-02

    Rehearsed, not improvised

    Migration scripts run several times on production copies, so go-live day repeats a process that already worked.

  • R-03

    SEO and integrations intact

    URL redirects, payment gateways, shipping, ERP and accounting connections are mapped and tested before the switch.

  • R-04

    A way back

    If any check fails during cutover, the rollback plan restores the old platform quickly with no data drift.

  • R-05

    Code and scripts you keep

    You own the migrated code, migration scripts and runbooks, so future moves do not start from zero.

How Platform Migration engagements run

Sheet P-01, delivery sequence

Clear stages with a review at the end of each, so you always know what happens next and what it costs.

  1. S1

    Inventory and audit

    We catalogue modules, data, integrations, URLs and dependencies on the current platform.

  2. S2

    Target design

    Target platform, data mapping, cutover method and rollback plan are agreed in writing.

  3. S3

    Build migration tooling

    Code is ported and repeatable scripts are written for schema, data and file transfer.

  4. S4

    Rehearse and validate

    Full trial migrations run on production copies with automated reconciliation reports.

  5. S5

    Cutover

    Final sync, smoke tests and traffic switch in an agreed window, with rollback on standby.

  6. S6

    Hypercare

    Close monitoring, quick fixes and decommissioning of the old platform once stable.

Where Platform Migration fits

  • Detail A

    Magento to Shopify replatforming

    An online retailer moves from a heavily customized Magento store to Shopify, migrating products, customers and order history, replacing custom features with apps or lightweight custom code, and preserving search rankings through careful redirects.

  • Detail B

    Upgrading a .NET Framework application

    A business application built on an older .NET Framework version moves to modern .NET, gaining performance, security updates and cloud hosting options, with automated tests confirming behavior stays the same for users.

  • Detail C

    Moving a legacy PHP application to Laravel

    A company running custom PHP code on outdated versions rebuilds it incrementally in Laravel, migrating modules one by one while both versions share the database, avoiding a risky big-bang switch.

  • Detail D

    Database migration to managed cloud

    An organization moves its self-managed SQL Server databases from aging servers to a managed cloud service, using replication to minimize downtime, validating data thoroughly and gaining automated backups, patching and high availability.

  • Detail E

    CMS migration for a content-heavy website

    A publisher moves thousands of articles, images and authors from an old CMS to a modern platform, preserving URLs and metadata, and improving editorial workflows without losing search traffic built over years.

Platform Migration, in depth

Sheet N-01, general notes

N1

Planning a migration roadmap

Platform migrations move an application, store or system from one technology to another: an outdated framework to a supported one, a self-hosted ecommerce platform to a SaaS platform, or an on-premises database to a managed cloud service. Each carries risk because the business depends on the existing system every day.

Planning starts with inventory. Document features, integrations, data entities, custom reports, scheduled jobs and URLs. Many migrations fail because a small but essential function, such as a nightly export to the accounting system, was never documented and is discovered missing after launch.

Decide what to migrate as-is, what to improve and what to retire. Migrations are a good opportunity to remove unused features and clean data, but changing too much at once increases risk. Separating the move itself from major redesigns often works best. Infrastructure moves frequently accompany platform changes. Where hosting also changes, coordinate with cloud migration planning so environments, networking and security are ready before application cutover.

N2

Data validation and reconciliation

Data is the hardest part of most migrations. Records must arrive complete, correctly transformed and linked to related records, from customers and orders to inventory and financial history. Errors discovered after go-live damage trust and can be very expensive to correct. The checks below are essential.

Validation should be automated wherever possible. Scripts compare counts, totals and checksums between source and target systems, producing reports that business owners can review and sign off. Business users should verify samples in the new system, checking that familiar records look correct. They often notice issues, such as wrong statuses or missing notes, that automated checks overlook. Repeat validation for every trial migration and the final cutover, so results are consistent and problems are fixed before go-live.

  • N2.aRecord counts by entity and status.
  • N2.bFinancial totals such as balances and order values.
  • N2.cRelationships between customers, orders and payments.
  • N2.dSample records reviewed by business users.
  • N2.eException reports for records that failed to migrate.
N3

Choosing a cutover strategy

Cutover is the moment users and traffic move to the new platform. A big-bang cutover switches everything at once during a planned window, which is simpler but riskier. Phased cutovers move users, regions or features gradually, reducing risk but requiring both systems to run in parallel for a period.

Techniques such as blue-green deployment keep the old and new environments available simultaneously, so traffic can be switched back quickly if serious problems appear. Data synchronization during the transition period ensures no transactions are lost in either direction. Rehearsals are essential. Running the full cutover sequence in a test environment, timing each step and practicing rollback, reveals problems while there is still time to fix them and gives the team confidence.

After cutover, hypercare provides intensive monitoring and support for several weeks, with quick fixes for issues and close communication with users and business owners. Agree in advance when hypercare ends and normal support takes over, and keep the old system available read-only until everyone is confident.

Technologies we use for platform migration

Proven, well-supported tools chosen for your scale, budget and team, never for novelty.

  • .NET
  • PHP
  • Laravel
  • Node.js
  • PostgreSQL
  • MySQL
  • Shopify
  • Magento
  • Docker
  • AWS

Platform Migration FAQs

Something else on your mind? Ask a consultant and get a reply within one business day.

How much does a platform migration cost?

The main drivers are codebase size, number of integrations, data volume and quality, custom features that have no equivalent on the target platform, and how little downtime you can accept. A store with standard catalogue data costs far less than a custom ERP-linked application. A fixed quote follows the free consultation and readiness assessment.

Can we migrate without taking the site or app offline?

Usually yes. We use change data capture or dual writes so the new platform stays in sync until the switch. Where a short freeze is unavoidable, we plan it for your lowest-traffic window and tell you the expected duration in advance.

How do you make sure no data is lost?

Every rehearsal ends with automated reconciliation: row counts, checksums, financial totals and sampled records compared between source and target. Your team reviews and signs off the final report before we cut over.

Will we lose Google rankings when moving our store to Shopify?

Not if redirects are done properly. We map every product, category and content URL to its new address, keep metadata, and monitor Search Console after launch to catch any missed pages quickly.

How is this different from legacy modernization?

Platform migration keeps your application's design and moves it onto a new stack or engine. Legacy modernization rethinks the architecture and often the features too. Many clients migrate first to get off an unsupported platform, then modernize in later phases.

How long does a migration take?

A focused store or database move often takes 4-8 weeks. Larger application migrations with many integrations typically run 3-6 months, delivered module by module with a rehearsal before each cutover.

How do you migrate user accounts and passwords?

Passwords are usually stored as hashes, which cannot be decrypted. Depending on the platforms, we import compatible hashes, migrate users gradually as they log in, or ask users to reset passwords with clear communication. Account data, preferences and history are migrated so users recognize their accounts immediately.

Can integrations move without partners changing anything?

Sometimes. Where possible, we preserve existing API contracts or place a compatibility layer in front of the new platform, so partners keep working without changes. When changes are unavoidable, we coordinate timelines, provide documentation and test environments, and support partners through the transition.

What is hypercare after a migration?

Hypercare is a period of intensified monitoring and support immediately after go-live, typically several weeks. Engineers watch errors, performance and data closely, respond quickly to user reports and hold regular check-ins with business owners, until the new platform runs smoothly under normal operations.

Since our first project

Happy clients
250+
Projects delivered
150+
Industries served
15+
Pricing and engagement models
  • Mutual NDA first

    Signed before any detailed discussion of your idea.

  • You own the code

    100% of the source code and IP is yours on delivery.

  • Reply in one business day

    From a solutions consultant, Mon to Sat, 09:30 to 18:30 IST.

  • Estimate in 48 hours

    A fixed quote or team estimate, broken down by milestone.

We work with clients across the USA, UK, Australia, UAE, New Zealand and India.

Where we work

Tell us what you're building.

A solutions consultant replies within one business day with next steps, a rough estimate and a suggested team.